
Step-by-Step Guide to Prefabricated Rubber Track Installation
Агуулга
This article will analyze in detail the material characteristics, construction process and core advantages of prefabricated rubber tracks to help you select materials scientifically and create a cost-effective sports space!
Core Advantages of Prefabricated Rubber Tracks
- Efficient construction, shortening the construction period by 70%. Factory prefabricated forming coils, directly paved on site, no need for on-site mixing and paving, the construction cycle only takes 3-5 days (traditional processes require 20-30 days).
- Environmentally friendly and pollution-free, zero solvent volatilization, in line with GB 36246-2018 environmental protection standards (TVOC≤0.05mg/m³), can be put into use 24 hours after completion.
- Excellent performance, strong UV resistance and weather resistance (-30℃~80℃ without cracking), service life of more than 10 years;
- Stable friction coefficient (0.6-0.8), impact absorption rate ≥35%, protect the joints of athletes.
- Low maintenance cost, dense and smooth surface, stains can be wiped clean, no need to regularly replenish particles or renovate coatings.

The Whole Process of Prefabricated Rubber Track Construction
Foundation treatment (key steps)
Surface requirements:
- Cement foundation: strength ≥ C25, flatness ≤ 3mm/3m, moisture content ≤ 5%;
- Asphalt foundation: porosity 3%-5%, no oil stains, no cracks.
Treatment process:
- Grind and clean the surface, inject epoxy resin glue into the cracks;
- Roller coating interface agent (enhance the adhesion of the roll material).
Roll material paving (standardized operation)
- Positioning and laying out: The laser laying out instrument calibrates the track boundary, with an error of ≤ 1cm;
- Laying the roll material:
- Unfold the roll material according to the design drawing and relax it naturally for 24 hours;
- Apply special glue (amount 1.5kg/㎡), compact and exhaust;
- The hot air gun in the curve area assists in shaping to ensure accurate curvature.
Joint and edge treatment
- Joint process: hot melt welding (temperature 130-140℃), tensile strength ≥50N/cm;
- Edge closing: polyurethane sealant filling to prevent warping and water seepage.
Line marking and maintenance
- Line marking construction: hot melt paint marking, line width 5cm±1mm, in line with IAAF standards;
- Finished product maintenance: closed for 48 hours, temperature >10℃, no trampling.
Precautions for Prefabricated Track Construction
Environmental requirements
- Construction temperature 10℃~40℃, air humidity ≤75%;
- Operation is prohibited on rainy and windy days.
Material acceptance
- Check the thickness of the coil (13mm±0.5mm) and surface flatness;
- Request an environmental protection test report (heavy metal, TVOC data).
Equipment selection
- Use professional hot melt welding machine and laser leveler to ensure process accuracy.
Precautions for Prefabricated Track Construction
Qualification Verification
- IAAF (WA) or China Athletics Association certification;
- ISO 9001 quality management system, environmental protection ten-ring certification.
Case Study
- IAAF (WA) or China Athletics Association certification;
- ISO 9001 quality management system, environmental protection ten-ring certification.
Service guarantee
- Quality warranty ≥ 8 years, free regular inspection service.
Сэтгэгдэл
Бүтээгдэхүүн
Тохиолдлууд
Халуун хямдралтай бүтээгдэхүүн
Үргэлжилсэн блог

Step-by-Step Guide to Prefabricated Rubber Track Installation
Prefabricated rubber tracks have become a popular choice for schools, stadiums and community sports venues due to their convenient construction, environmental protection and safety, and stable performance.

What are the installation conditions of prefabricated running tracks?
In today’s context of increasing requirements for sports venues, prefabricated running tracks have become the first choice for many schools, stadiums and other places due to their excellent performance and convenient installation methods.

How to Repair the Prefabricated Rubber Track?
Энэхүү гарын авлагад биеийн тамирын болон спортын газруудад ашигладаг угсармал резинэн замыг засварлах, засварлах зааварчилгааг өгсөн болно.
Бидэнтэй холбоо барина уу
- [email protected]
- +86-25 58933771
- Наньжин хотын Пукоу дүүрэг, Цяолин аж үйлдвэрийн парк
Шошго
Холбоотой блогууд

Тоглоомын талбайн резинэн шалны хамгийн сайн материал юу вэ?
Энэхүү нийтлэл нь тоглоомын талбайн гадаргуугийн янз бүрийн хувилбаруудыг судалж, таны хэрэгцээнд тохирсон тоглоомын талбайн гадаргууг сонгоход тусална.

SBR резинэн мөхлөг гэж юу вэ?
SBR-ийг анх 1930-аад онд Германд дайны үед хомсдож байсан байгалийн каучукаас өөр хувилбар болгон бүтээжээ. Энэ нь хурдан дугуй үйлдвэрлэлийн чухал материал болсон.

Цаг агаарын бүх цаг агаарт тохирсон гүйлтийн зам засах гарын авлага
Энэхүү нийтлэл нь бүх цаг агаарын гүйлтийн замын гадаргуугийн ертөнцөд гүн гүнзгий нэвтэрч, янз бүрийн гадаргуугийн төрлүүд болон таны спортын замд хамгийн сайн сонголтыг сонгоход анхаарах гол хүчин зүйлсийг судлах болно.